Salsbury-industries 4375 Mail Package Drops In-Ground Mounted Pedestal Manuel d'utilisateur

Naviguer en ligne ou télécharger Manuel d'utilisateur pour Meubles Salsbury-industries 4375 Mail Package Drops In-Ground Mounted Pedestal. Salsbury Industries 4375 Mail Package Drops In-Ground Mounted Pedestal User Manual Manuel d'utilisatio

  • Télécharger
  • Ajouter à mon manuel
  • Imprimer
  • Page
    / 1
  • Table des matières
  • MARQUE LIVRES
  • Noté. / 5. Basé sur avis des utilisateurs
Vue de la page 0
SALSBURY INDUSTRIES
1010 East 62
nd
Street, Los Angeles, CA 90001-1598
Phone: 1-800-624-5269 Int’l Phone: 323-846-6700
Fax: 1-800-624-5299 Int’l Fax: 323-846-6800
www.mailboxes.com engineering
@mailboxes.com
Installation instructions are provided as general guidelines. It is advised that a professional installer be consulted. Salsbury Industries assumes no product assembly or installation liability.
Copyright © 2011 Salsbury Industries. All rights reserved. (Rev. 02, 12/15/11)
Mail Package Drops – 4375
In-Ground Mounted Pedestal Installation Instructions
U.S.P.S. APPROVED
Installing the In-Ground Mounted Pedestal
When you install a curbside or roadside mailbox, make sure that it is
easily accessible to the mail carrier. By regulation a locked mailbox
should be 41” to 45” from the ground or street surface up to the point
of mail entry. The door should be set back 6” to 8” back from the
front face of the curb or the road edge. However, you should check
with your local postmaster to ensure that the mailbox is installed
according to local regulations. It is important to note that it is not the
responsibility of mail carriers to open mailboxes that are locked,
accept keys for this purpose, or lock mailboxes after delivery of the
mail.
To install the in-ground mounted pedestal, begin by digging a hole for
the concrete footing and then prepare the concrete. The top surface
of the footing should be about 12” by 18”. See the illustration for the
relative position of the rectangular footing to the pedestal or post and
mail package drop. The concrete should extend into the ground 24”
or greater if your local frost line is deeper. Installing the concrete
below the frost line will prevent movement during ground freezing
and thawing. The bottom of the hole for the concrete footing should
be filled with a depth of about 6” of gravel to promote drainage under
the post. The top of the footing should be sloped for water runoff.
When digging the hole for the footing, be careful to not puncture
water, sewer, or gas lines.
After digging the hole, set the pedestal in the hole and fill the hole
with the prepared concrete mix. Prod the mix with a stick while filling
to reduce any air pockets. If you want to conceal the concrete, pour
it to within a few inches of the top of the hole and cover with soil after
the concrete has set. Use a carpenter’s level on the sides of the post
to ensure that the post is aligned vertically. Periodically check the
vertical alignment of the post as the concrete is curing.
Vue de la page 0
1

Résumé du contenu

Page 1 - Mail Package Drops – 4375

SALSBURY INDUSTRIES 1010 East 62nd Street, Los Angeles, CA 90001-1598 Phone: 1-800-624-5269 Int’l Phone: 323-846-6700 Fax: 1-800-624-5299

Commentaires sur ces manuels

Pas de commentaire